Detailed design, supply, transportation, storing at site, installation, construction and erection, temporary works, testing, flushing, disinfection, commissioning, handing over of the complete WORKs and maintenance in accordance with the drawings and specifications for the installation, relocation and protection of waterlines.
|
|
|
|
|
Supply, Installation, Testing and Commissioning of the following pipelines complete with the required isolation valves, flow-control valves, flow meters, fittings etc. and associated civil and earth works:
|
|
|
|
|
Detail design of the mechanical and piping installation
|
|
|
|
|
Detail design of the mechanical and piping installation
|
|
|
|
|
Supply, Construction and Commissioning of pre-insulated carbon steel with HDPE jacket of different sizes (150mm – 1100mm) of total length 23,500 meters including network valve chambers, plot valve chambers, drain and vent risers, thrust blocks, road crossing ducts, cable ducts etc.
|
|
|