Installation of 500 mm dia HPDE pipes to carry 30,000.00 cubic meter of water for a distance of 10,700 meters up to Tiger Woods Dubai Plot.
|
|
|
|
|
Construction, completion and maintenance of Irrigation Line from Irrigation chamber at Emirates Road to Mudon site for a length of 5.75 km comprising 1000, 800 and 500 mm dia pipes including construction of valve chambers and flow meter chambers.
|
|
|
|
|
The Project is made to Construct Sewerage and Drainage Networks for Al Quoz 3rd & 4th.
|
|
|
|
|
The project consists of construction of 1000 Ø branch irrigation supply line from 1400 Ø existing irrigation main installed along Emirates Road.
|
|
|
|
|
Water Supply Works, Irrigation & Fire Hydrants Network, Sewerage Network and Storm Water Network for Operatives Village No. 2, 3 & 4
|
|
|