Water Distribution Network to Industrial City of Abu Dhabi (ICAD) Extension Phase 1 Contract No. D-6143 + V.O. NO. 1 – Water Supply to Wedaihi Farms
Client: Abu Dhabi Water & Electricity Authority (ADWEA)
Consultant: Halcrow International
Scope of Works:
Detailed design, supply, transportation, storing at site, installation, construction and erection, temporary works, testing, flushing, disinfection, commissioning, handing over of the complete WORKs and maintenance in accordance with the drawings and specifications for the installation, relocation and protection of waterlines.

The water works comprise the following:
a)Supply, Installation and construction of new ductile iron waterline sizes DN 1200 mm through DN 150 mm including line valves, control valves, sector measuring points, fire hydrants, connections to existing water network.
b)Waterline protection works in roads or parking areas by means of concrete protection slabs.
c)Construction of ducts for proposed or future D.I. waterlines.
d)Installation of marker posts.
e)Construction of thrust and anchor blocks.
f)Construction of valve chambers.
g)Construction of air release valve boxes and stand blocks for pillar fire hydrants.
h)NDRC – construction of pipelines under existing roads and services using NDRC method.
i)House connections.
j)Construction of bulk consumer connection chambers.
Back to Present Projects
© Copyright 2007
site by ayam creative
INFRASTRUCTURE
ELECTRICAL AND INSTRUMENTATION
MECHANICAL
SUBMARINE
IRRIGATION AND LANDSCAPING
CIVIL CONSTRUCTION
FABRICATION WORKSHOP
PAST
PRESENT