Construction, completion and maintenance of Irrigation Line from Irrigation chamber at Emirates Road to Mudon site for a length of 5.75 km comprising 1000, 800 and 500 mm dia pipes including construction of valve chambers and flow meter chambers. NDRC works for 165 meters, valve chambers, washout air valves, flow meters and future connection chambers. Excavation depth vary from 1 meter up to max. 11 meters. |