Scope of Works:
|
|
The Project consists of: |
|
a) |
Installation of 500 mm dia HPDE pipes to carry 30,000.00 cubic meter of water for a distance of 10,700 meters up to Tiger Woods Dubai Plot. |
|
b) |
Making connection to the existing line near Global Village. |
|
c) |
Provision of booster pumps with spares to pump 15,000 cubic meter per day. |
|
d) |
Maintaining and operating the lines and pumps for 720 days. |
|
e) |
Removing the pipes and pumps after the contract period. |
|
|
Back to Present Projects |