Maintenance of Glass Reinforced Vinyl Epoxy (GRVE) Piping Systems & Other Services
Status
Location
Client
Al Maryah Island Promenade Extension Package 02
Status
Location
Client
Site Wide Logistics and Environmental Monitoring Works
Status
Location
Client
EPC of District Cooling Plant at Mirdif Hills
Status
Location
Client
Permanent Dewatering System at Habshan-II Flare Area knock out drum area
Status
Location
Client
EPC of chilled water pipeline network for RTA route 2020 stations
Status
Location
Client
External utilities connections-Dubai Hills Estate
Status
Location
Client
BEAAT Expansion Project
Status
Location
Client
Treated Sewage Effluent Pipeline
Status
Location
Client
Non-Process support buildings for EGA
Status
Location
Client
We design, build, and engineer technically complex facilities. Including desalination plants, district
cooling plants, and pumping stations that support critical industrial and energy operations.
Aquifer Storage & Recovery Project
Status
Location
Client
Mirfa 2 Reverse Osmosis Plant
Status
Location
Client
Pre-Stressed Tanks and Pumping station
Status
Location
Client
RCC water tanks(20 MIG capacity) & Pumping Station
Status
Location
Client
Fujairah Port infrastructure
Status
Location
Client
Working closely with developers and utility providers, we deliver comprehensive underground infrastructure solutions,
including pipelines and cabling for energy and electro-mechanical systems, as well as potable water, sewage, drainage,
and district cooling networks that power and serve communities.
Water pipeline from Lulu Island Pumping Station
Status
Location
Client
Substation and 400 KV cable works
Status
Location
Client
Upgrading of Salam Street – Contract 2
Status
Location
Client
Potable Water Supply Pipeline network
Status
Location
Client
District Cooling Scheme enabling works
Status
Location
Client
Working with national energy providers, we deliver downstream EPC services for oil refineries and gas plants.
We provide safe, reliable solutions for the transmission and processing of energy from the wellhead and beyond.
ADNOC Pipeline Integrity Upgrade
Status
Location
Client
Design and Construction of KIZAD Gas Network – Phase 1
Status
Location
Client
Splitting of 18 inch Condensate ADNOC Pipeline
Status
Location
Client
Protection Facilities for ADNOC Main Oil Terminal
Status
Location
Client
EPC for Enhancement of Sulphur Dust Control Systems
Status
Location
Client
EPC for Upgrading of Burn Pit-B and Replacement of Metering Systems
Status
Location
Client
EPC for process control and power systems
Status
Location
Client
Repair works of ADNOC Oil tanks bund walls
Status
Location
Client
ADNOC Furnace Combustion Optimisation
Status
Location
Client
Replacement of ADNOC Fresh Fire water pumps, motors & associated works
Status
Location
Client
Partnering with leading developers, we provide disciplined project management and turnkey engineering,
procurement, and construction solutions for our partners and clients. We deliver quality
projects on time and to specification.
Project DIVE
Status
Location
Client
Al Maryah Waterfront
Status
Location
Client
The MELGRANO
Status
Location
Client
Prayer Room for Cleveland Clinic
Status
Location
Client
Aqaba Cruise Terminal Phase 1
Status
Location
Client
ACTIVE Al Maryah Sports & Recreation
Status
Location
Client
Etihad rail infrastructure works
Status
Location
Client
North Al Maryah Island Sports Precinct- Sports Hub
Status
Location
Client
Apple Store at Galleria Mall
Status
Location
Client
EPC for Fujairah Port Landside Works
Status
Location
Client