Client: ZADCO
Contractor: Habtour Leighton Group
Contract Period: 2016 – 2013
Location: Upper Zakum Island – Abu Dhabi
Value: AED 206,073,976.00
Peak manpower 120
Man- hours accident free 324,300.00
Total lost time through incidents Zero
Equipment Installed 120
Total LV Cables Laid 50,000 m
Total MV Cables Laid 5,500 m
Total Equipment Installed 120
Tota Design Documents 1524