Dubai Municipality
Infrastructure
Dubai, UAE
DS 207/3 Sewerage and Drainage System for Al Hind 3
The scope of work for the sewerage network comprises of house connection serving the residential units and the public facilities. The network conveys the sewage flow by a main collector line to a proposed STP. The total length of the Main gravity network is 31 km and house connection is 27 Km.
Sewerage Main Manholes – 442 nos
House Connection Manholes – 1686 nos
Scope of storm water system
The scope of work for storm water in Al Hind 3 comprises a main pipeline length of about 43 km as a gravity system. Based on topography, the Storm water will be discharged to the future DP 08 Pond. The total length of the Main gravity network is 30 km and Gully Network is 12 Km.
Land Drain Netowrk is 12 Km
Storm Water Manholes – 405 nos
A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site.