Construction of External Access roads that includes preparation of sub grade formation, Subbase laying, Aggregate road base laying, Asphalt works, Pavement construction on the sidewalks, Road markings and sign post installation.
Supply and installation of U PVC cable ducts for the street light network, Installation of Street light foundation, Light poles, cable termination and commissioning of the street light network.
Supply and installation of 400 mm Dia GRP Pipes for the Irrigation network, Removal of gate valves and Re-construction of the valve chamber.
installation of LV cable ducts, Concrete surround for the PVC ducts and construction of spare ducts