DRAINAGE AND IRRIGATION WORKS |
IRRIGATION SUPPLY LINE - PHASE 1 FOR INVESTOR PROJECTS BESIDE GLOBAL VILLAGE
Client: TATWEER
Contractor: K A M E
Contract Period: 30/01/2007 – 10/07/2008
Scope of Work:
The project consists of construction of 1000 Ø branch irrigation supply line from 1400 Ø existing irrigation main installed along Emirates Road. The 1000 Ø to be installed using NDRC method while crossing Emirates Road. |