MECHANICAL WORKS |
UNIT III TO UMM AL NAR WATER SUPPLY PIPELINE. CONT.NO. WED/77/97
Client: ADWEA
SCOPE OF WORKS: Tebodin M.E
Contract Period: 01.12.1998 – 31.08.2000
Brief Description:
The project consists of :
- Supply and lay of 1000 mm dia GRP pipes from Unit III to Umm Al Nar, along the channel street for a total length of 15 KM.
- Construct extension to the existing pumpstation.
- Supply, Install, Test and Commission water transfer pumps
- Supply, Install, Test and Commission control panels and
- all associated telemetry system
- 600 mm submarine crossing by directional drilling to Samalia Island.
|