MECHANICAL WORKS

UNIT III TO UMM AL NAR WATER SUPPLY PIPELINE. CONT.NO. WED/77/97

Client: ADWEA

SCOPE OF WORKS: Tebodin M.E

Contract Period: 01.12.1998 – 31.08.2000

Brief Description:

The project consists of :

  • Supply and lay of 1000 mm dia GRP pipes from Unit III to Umm Al Nar, along the channel street for a total length of 15 KM.
  • Construct extension to the existing pumpstation.
  • Supply, Install, Test and Commission water transfer pumps
  • Supply, Install, Test and Commission control panels and
  • all associated telemetry system
  • 600 mm submarine crossing by directional drilling to Samalia Island.