Gulf Energy Systems L.L.C. (GES)
a leading company to supply chilled water to existing and new commercial, residential and industrial units, have awarded the project “T10 Al Dhafra Air Base – New Villas, External Chilled Water Distribution Network & Energy Transfer Stations” Contract No. T10-G-C-01-05 to Al Nasr Contracting Co. to execute the below listed scope of work on a fast track construction schedule to be completed in 3 phases, the first phase in 8 weeks and the complete project in 7 months.
Client: Gulf Energy Systems L.L.C. (GES)
Contractor: Al Nasr Contracting Co. (L.L.C.)
Contract Period: 09.07.2005 to 18.04.2006
Scope of Work:
A: Energy Transfer Stations (ETS)
- Installation of secondary circuit chilled water pipes within ETS complete with supports , fittings, valves, strainers, temporary by-pass of the heat exchangers, all required pressure and temperature measuring instruments etc.
B. External CHW Distribution Network
- Installation of pre-insulated external chilled water pipes, buried underground complete with all necessary air vents and high points and drains at the low points…etc.
|