FREIGHT FACILITY EXTENSION AND CONSTRUCTION OF AIR CARGO STORES AT ABU DHABI INTERNATIONAL AIRPORT – PHASE- 1-CONTRACT NO. 2/ 99

Client: Civil Aviation Department

Consultant: Al Burj  Engineering Consultants

Contract Period: 12/02/2001 to 22/09/2002

Scope of Work:

Construction of Abu Dhabi International Airport Freight Facility Building that includes:

  • Levelling, cutting/ filling the project area of 22500 m2
  • Construction of freight facility building of 10000 m2 floor area and 3500 m2 of mezzannine floor.
  • Supply and install pre-cast wall panels and double tee pre-stressed roof slabs.
  • Supply and install skylights of special design.
  • Construction of roads, security fences, parking areas, loading and unloading sections and landscaping.
  • Complete plumbing, rainwater disposal, surface water system and connections to the main network.
  • Supply and install, connect, test and commission power network for the building.
  • Supply and Install CCTV network.
  • Supply & install fire fighting and fire alarm system.
  • Supply & install telephone and communication system.
  • Supply and Install airconditioning with roof top units and extract fans.
  • Testing and commissioning of equipment.