INDUSTRIAL PLANTS

FUJAIRAH II – DESALINATION PLANT- CIVIL WORKS PURCHASE ORDER NO. CL0182/ 001

Client: Abu Dhabi Water & Electricity Authority      (ADWEA)

Main Contractor: Sidem, France

Contractor: Al Nasr Contracting Co. L.L.C

Consultant: Halcrow International

Contract Period: 08/05/2008 – June 2010


Scope of Work:

  1. Foundations for Desalination Units & Steam Transformers 12 Desalination units and Steam Transformers.
  2. Switchgear Building for Desalination Units A building having dimensions of 37 m x 19 m with clear height of 3.6 m under roof beam.
  3. Pipe racks
    Pipe and cable racks and construction of all foundation, grouting of embedded steel achors, painting of exposed concrete pedestals.
  4. Seawater supply, brine reject, distrillate and potable forwarding lines.
    Pipe handing, pipe preparation for lamination, pipe laying and lamination.
  5. Mooring Jetty.
    Construction of temporary jetty for off loading of evaporators and heavy structures.
  6. Compressor Shelters.
    Steel shelter to house the air compressor skids.
  7. Potable Water Storage system.
    Four (4) tanks, each of dia 90m, and operating capacity of 91,609 cum.
  8. Fire fighting protection system.
    Firewater underground ring main lines, fire hydrants with hose cabinet.
  9. Spare Parts Storage Building
  10. Road & Paving
  11. Surface Water Drainage System.
  12. Plant Waste Water Drainage System.
  13. Street Lighting
  14. Electrical earthing buried grid system
  15. Plant communication
  16. Temporary facilitiess