INDUSTRIAL PLANTS |
FUJAIRAH II – DESALINATION PLANT- CIVIL WORKS
PURCHASE ORDER NO. CL0182/ 001
Client: Abu Dhabi Water & Electricity Authority (ADWEA)
Main Contractor: Sidem, France
Contractor: Al Nasr Contracting Co. L.L.C
Consultant: Halcrow International
Contract Period: 08/05/2008 – June 2010
Scope of Work:
- Foundations for Desalination Units & Steam Transformers
12 Desalination units and Steam Transformers.
- Switchgear Building for Desalination Units
A building having dimensions of 37 m x 19 m with clear height of 3.6 m under roof beam.
- Pipe racks
Pipe and cable racks and construction of all foundation, grouting of embedded steel achors, painting of exposed concrete pedestals.
- Seawater supply, brine reject, distrillate and potable forwarding lines.
Pipe handing, pipe preparation for lamination, pipe laying and lamination.
- Mooring Jetty.
Construction of temporary jetty for off loading of evaporators and heavy structures.
- Compressor Shelters.
Steel shelter to house the air compressor skids.
- Potable Water Storage system.
Four (4) tanks, each of dia 90m, and operating capacity of 91,609 cum.
- Fire fighting protection system.
Firewater underground ring main lines, fire hydrants with hose cabinet.
- Spare Parts Storage Building
- Road & Paving
- Surface Water Drainage System.
- Plant Waste Water Drainage System.
- Street Lighting
- Electrical earthing buried grid system
- Plant communication
- Temporary facilitiess
|