National Cooling Co. has entered into an agreement with the U.A.E. armed forces to introduce the central cooling system/network in Zayed Military City and other locations.
Al Nasr Irrigation & Contracting Co. was awarded the contract for the detailed engineering, procurement, construction & commissioning works for the water line, gas line & 11KV power lines feeding Tabreed 3, Tabreed 2 and Tabreed 1 chilled water plants.
|
|
Client:National Central Cooling Co (Tabreed) |
Contract Period:Completed on 2001 |
|
Scope of Works:
|
|
a) | Supply and Install HDPE pipes 400 mm, 355 mm and 250 mm water and gas lines almost 38 KM and CS gas line pipe (8") 3 KM.
|
|
b) | Cathodic Protection Works for C.S gas line.
|
|
c) | Supply and Installation of 11 KV electric power to T2 and T3, approx. 6 KM.
|
|