As part of development projects planned for the islands around Abu Dhabi the Capital of U.A.E. The Abu Dhabi Water & Electricity Authority has awarded this fast track contract to Al Nasr Irrigation & Contracting Co. for the design, engineering & construction of HDPE submarine water pipelines between the Abu Dhabi Capital City and Al Qarasina Island almost 2.0 Km from the shores. |
|
Owner: Abu Dhabi Water & Electricity Authority |
Duration: 16/10/2005 - 15/06/2006 |
Client: Abu Dhabi Water & Electricity Authority |
|
Scope of works: |
|
Pipeline Works |
|
a) | Supply and construction of 255 mm dia HDPE line with length of 2,250 meters. |
|
b) | Supply and construction of 160mm dia HDPE line with length of 2,350 meters.
|
|
c) | Supply and construction of all associated fittings required to fulfill the construction requirements.
|
|
|
Civil Works |
|
Construction of reinforced concrete chambers, thrust block, etc. for the above mentioned pipelines including chamber accessories, all as per drawings and specifications. |
|
Testing & Commissioning |
|
a) | Hydrostatic testing of the complete pipeline system. |
|
b) | Disinfection and flushing of the complete pipeline system. |
|
c) | Testing and commissioning of modified control system of Lulu Island Pump Station. |
|
Back to Past Projects |
|
|
| |
|
|
|
|