Al Nasr Irrigation & Contracting Co. was awarded this prestigious contract that required total design, procurement, installation and commissioning works to upgrade the water supply network to Abu AL Abyadh Island by installing a submarine pipeline to the island and construction of New Pumping Station to boost the water supply on the island. |
|
Owner: Abu Dhabi Water & Electricity Authority |
Duration: 16/09/2004 to 15/12/2005 |
Client: Abu Dhabi Water & Electricity Authority |
|
Scope of works: |
|
Pump Station |
|
a) | Construction of pumping station with 4 pumps rated 300l/s at 31m head with all ancillary works including MCC, Mimic Panel, Overhead traveling crane, transformer, HV panel, Hydro=pneumatic surge vessels, tanks, instrumentation works, etc.
|
|
b) | The pump station will be connected to the existing pipe network |
|
Submarine Pipeline |
|
a) | Hydrostatic testing of the complete pipeline system. |
|
b) | Disinfection and flushing of the complete pipeline system. |
|
c) | Testing and commissioning of modified control system of Lulu Island Pump Station. |
|