An Urgent Project undertaken by the Abu Dhabi Water & Electricity Authority to upgrade the existing water network lines in the hearth of the capital city of Abu Dhabi at a very prestigious location in front of the Etisalat headquarters with high traffic and dense population section of the city.
|
|
Owner: Abu Dhabi Water & Electricity Authority (ADWEA) |
Duration: 29/05/2002 to 28/08/2003
|
|
Scope of works: |
|
a) | Survey and prepare the existing and proposed pipeline modification shop drawings. |
|
b) | Supply and installation 400 mm DI water line pipes. fittings, valves & fire hydrants. |
|
Restore the grounds to their current conditions. |
|
Back to Past Projects |
|
|
| |
|
|
|
|