a) | Supply and Installation of two DN 1200 DI interconnection pipelines linking two Taweelah A2 DN 1200 discharge headers with two Taweelah A1 discharge headers DN 1200 to Unit III.
|
|
b) | Supply and construction of two branches DN 1200 and DN 1000 for Hizam Al Ghabat supply inside Taweelah desalination station compound.
|
|
c) | Supply and installation of flow meters and motorized flow control valves at all outward transmission lines of Taweelah Desalination Station.
|
|
d) | Demolition and removal from site the abandoned DN 1200 pipelines of Taweelah A2 concrete blocks, valve pits, ducts etc.
|
|
e) | Construction of reinforced concrete chambers for chambers for valves and flow meters.
|
|
f) | Construction of thrust and anchor blocks.
|
|
g) | Installation of marker and sign posts.
|
|
h) | Laying of pipeline warning tape including excavation, backfilling and making embankment etc.
|
|