a) | Survey existing services and ground levels for 27 Km pipeline and access road.
|
|
b) | Design pipeline profile drawings, valve chambers, thrust blocks, road crossings, line anchors, access roads, protection slabs, wash outs, air vents, tie-on details with CS trunk line and the fibre optic system for remote control system and connections with the main SCADA network.
|
|
c) | Procure pipes, fittings, valves, fibre optic lines and accessories.
|
|
d) | Excavate, lay, construct chambers, and install valves & fittings and hydro-test to 27 bars the 27 Km of Twin GRP 1400 mm pipeline network. |
|
e) | Construct and maintain temporary access roads.
|
|
f) | Construct embankment and bund formation and other similar related earthworks throughout the entire length of the pipeline. |
|
g) | Construct embankment and bund formation and other similar related earthworks throughout the entire length of the pipeline. |
|
h) | Connections and disconnections to existing water pipelines.
|
|
i) | Reinforced concrete valve and meter chambers complete with all accessories, access ladders, manhole covers and frames, ventilation pipes, etc.
|
|
j) | Reinforced concrete inspection chambers for fiber optic cables complete with all accessories, manhole covers etc.
|
|
k) | Reinforced concrete service culverts under existing roads.
|
|
l) | Reinforced concrete drainage culverts under pipe bunds.
|
|
m) | Reinforced concrete anchor/thrust blocks and line anchors.
|
|
n) | Reinforced concrete pipeline protection slabs.
|
|
o) | Thrust boring for road crossings.
|
|
p) | Thrust boring for gas and oil pipeline crossings
|
|
q) | Installation of Fiber Optic cables and associated ducts.
|
|
r) | Installation of electrical and control systems including electromagnetic flow meters, pressure transmitters, actuators and associated distribution boards and control cabinets etc.
|
|
Commissioning and test run of the systems as may be required. |
|