a) | Civil Engineering Construction for Lot "C"
|
|
b) | The Subcontract Scope of Works comprises the complete Civil and Building Works associated with the Mirfa Pumping Station as per the specifications, drawings and BOQ.
|
|
c) | Complete Pump Station building substructure up to top of ground floor slab and perimeter up stand (which shall be to water retaining codes) including all excavation, dewatering as required, protection to earth slopes etc. by providing adequately designed sheet piles with safety measures for restraint of these pipes.
|
|
d) | Complete Pump Station building superstructure including all structural steel work, roof sheeting, wall cladding, reinforced concrete work, platforms, stairs, equipment bases, windows, doors etc. with all specified internal and external finishes.
|
|
Chlorination Building housing gas cylinders, chlorinators and dosing pumps including neutralization area. The work shall comprise of the following:
|
|
a) | Excavation and foundation works up to plinth level including cutting, filling, concrete works etc.
|
|
b) | Construction of reinforced concrete floor slab, equipment foundation, concrete channel for pipes, cables and drains etc.
|
|
c) | Structural concrete super structure, roof etc.
|
|
d) | Supply and construction of doors, windows, ventilators, platforms and walkways, railings, stairways etc.
|
|
Complete Service Block (connected to pump station building) with control room, MV and LV room, transformer bays, office rooms, workshop, store room, battery room etc. comprising of the following:
|
|
a) | Excavation and foundation works up to plinth level including cutting, filling and concrete works etc.
|
|
b) | Construction of reinforced concrete floor slab, equipment foundation, concrete channel for pipes, cables and drains block work walls, partitions, plastering, tiling etc.
|
|
c) | Structural concrete super structure, roof etc.
|
|
d) | Supply and construction of doors, windows, ventilators, platforms and walkways, railings, stairways etc.
|
|
Construction of modular access floors and false ceilings in control room, MV and LV rooms.
Surge Vessel Foundation comprising of:
|
|
a) | Supply and construction of foundation including steel supports and access ladders including excavation and foundation works up to plinth level including cutting, filling, concrete works etc.
|
|
Chambers and External Trenches comprising of the following shall be covered:
|
|
a) | Valve Chambers
|
|
b) | External Pipe and Cable Trenches.
|
|
c) | Anchor Blocks and Thrust Blocks for pipes and pipelines.
|
Auxiliary Structures and Buildings:
|
a) | Supply and Construction of shaded car parking and any other structure/building required for the completion of the works.
|
External works. supply and construct:
|
a) | Steel site entrance gates (sliding), steel chain link fence around the site, road works including culverts and covered car parking with interlocking tile base.
|
|
b) | Asphalt road as indicated on drawings.
|
|
c) | Septic tanks and soak away pits for service block, store and workshops and any other buildings as required.
|
|
Back to Past Projects |