a) | Pipeline Works for Lot "B"
|
|
b) | Installation of twin 1600 mm diameter pipelines from chainage 64Km to chainage 128Km and single 1600 mm diameter pipeline to Unit IV in earth bunds, embankments and trenches.
|
|
c) | Site preparation, trench and pit excavations, bedding and backfilling to pipes, structures and chambers, embankment and bund formation and other similar related earthworks. |
|
d) | Connections and disconnections to existing water pipelines.
|
|
e) | Installation of free issued valves and fittings.
|
|
f) | Reinforced concrete valve and meter chambers complete with all accessories, access ladders, manhole covers and frames, ventilation pipes, etc.
|
|
g) | Reinforced concrete inspection chambers for fiber optic cables complete with all accessories, manhole covers etc.
|
|
h) | Reinforced concrete service culverts under existing roads.
|
|
i) | Reinforced concrete drainage culverts under pipe bunds.
|
|
j) | GRP service ducts under pipe bunds. |
|
k) | Split ducts to existing services. |
|
l) | Protection to existing services under pipe bunds.
|
|
m) | Reinforced concrete anchor/thrust blocks and line anchors.
|
|
n) | Reinforced concrete pipeline protection slabs.
|
|
o) | Thrust boring for road crossings.
|
|
p) | Thrust boring for gas and oil pipeline crossings.
|
|
q) | Installation of Fiber Optic cables and associated ducts.
|
|
r) | Installation of electrical and control systems including electromagnetic flow meters, pressure transmitters, actuators and associated distribution boards and control cabinets etc.
|
|
Commissioning and assisting with test run of the systems as may be required.
|
|