The 160KM highway between Abu Dhabi and Dubai was built to accommodated the increasing traffic between the two cities. The 4 lane (in each direction) highway was divided into several contracts and awarded to several contractors at the same time to assure the timely completion of this artilary road section.
Al Nasr Irrigation & Contracting Co. was awarded the sub-contract works from different contractors to do the "water works" section of the contracts that added up to a distance of over 45 Km of the road sections.
|
|
Client: PWD
|
Main Contractor: Hilalco
|
Subcontractor: Al Nasr Irrigation & Cont. Co.
|
Contract Duration: Till 1997.
|
|
Scope of Works:
|
|
Construction, installation and maintenance of the works in connection with the relocation and protection of Ductile Iron Water Transmission Pipeline at KM 33 + 000 to 33 + 750 and at Al Reef Interchange.
|
|