Owner: Abu Dhabi Water & Electricity Authority |
Duration: 4/09/2005 to 3/03/2007 |
|
Scope of works: |
|
Pipeline Works |
|
Supply, Installation, Testing and Commissioning of the following pipelines complete with the required isolation valves, flow-control valves, flow meters, fittings etc. and associated civil and earth works:
|
|
a) | DN 800mm onshore pipeline from the pump station at Lulu Island up to the existing water network at the Emirates Palace Hotel, a total of 7.7 KM.
|
|
b) | Offshore DN 34” CS submarine pipeline constructed by directional drilling between Lulu Island and Breakwater area approx. 500m.
|
|
c) | A 24” CS water pipeline on the section of the break water in Abu Dhabi city through the existing structures and the existing bridge to replace the existing DN 300mm D.I. pipeline and removing the GRP 600mm Duct.
|
|
Civil Works |
|
Construction of reinforced concrete chambers, thrust block, etc. for the above mentioned pipelines including chamber accessories, all as per drawings and specifications.
|
|
Testing & Commissioning |
|
a) | Hydrostatic testing of the complete pipeline system. |
|
b) | Disinfection and flushing of the complete pipeline system. |
|
c) | Testing and commissioning of modified control system of Lulu Island Pump Station. |
|
|
Modification Works at Lulu Pump Station
|
|
Modification of desisting ABB control system at Lulu Island Pump Station in order to operate four pumps (3 running and 1 standby) instead of the existing system (2 running & 2 standby).
|
|
Back to Past Projects |
|
|
| |
|
|
|
|