Irrigation System for Wadi Ryum Fodder Farm Phase II
Supply and installation of R.O. plant in the desert at Umm Al Zumool to desalinate the ground water pumped from the area to a potable quality.
Client: Abu Dhabi Municipality
Consultant: Arabian Engineering Centre
Duration: April 1990 to October 1991
Scope of Work:
The FIRST project of it's kind in Abu Dhabi Emirates Detailed design & construction of Irrigation tanks, 7 KM of pipeline, Pumping station, Irrigation network, Control station & 325 hectares of irrigated land complete with testing, commissioning & maintenance.
A. Project Highlights
a)700 mm AC pipe line App. 7 KM
b)Two Numbers of One Million Gallon each Reinforced Concrete water tanks
c)Pumping Station consisting of:
  • 6 (six) Pumps 470-m3/hr capacities each.
  • 2 (two) jockey pumps
d)Generator Station consisting of:
  • 3 (Three) Gensets 910 KVA each
  • One Genset 250 KVA
e)D.C.I. main & sub-main pipelines of 200 mm & 600 mm diameters. App. 19 KM.
f)Irrigation Network pipelines of 75 mm ~ 250 mm diameters PVC. App. 224 KM.
g)122 Control valves to control various areas.
h)4 pivots to cover 75 Hectares.
i)Drip Irrigation scheme consisting of 66,000-meter long polythene pipes with 60,000 drippers.
j)11,500 sprinklers to cover 325 Hectares.
k)Control station consisting of:
  • Mimic diagram
  • Control panels
  • Complete automated operation.
Back to Past Projects
© Copyright 2007
site by ayam creative
INFRASTRUCTURE
ELECTRICAL AND INSTRUMENTATION
MECHANICAL
SUBMARINE
IRRIGATION AND LANDSCAPING
CIVIL CONSTRUCTION
FABRICATION WORKSHOP
PAST
PRESENT