a) | Survey of the existing lines and their current conditions.
|
|
b) | Supply and install turbine type flow meters with pulse units in concrete chambers.
|
|
c) | Supply and install control valves with strainers.
|
|
d) | Supply and install ductile iron pipe work and respective valves.
|
|
e) | Supply and install of solar supply system with 24v DC outputs or normal 230v AC power supply for the flow meters.
|
|
Construct all Valve Chambers related to the above activities.
|
|