Development & Improvement of Water Distribution TRIP 2001, Sector E-48, Abu Dhabi Contract No. 2001
An Urgent Project undertaken by the Abu Dhabi Water & Electricity Authority to install water network lines for a new prestige housing development in the Eastern section of the Capital city of Abu Dhabi during the execution of the roads construction.

The project details are:
Owner: Abu Dhabi Water & Electricity Authority (ADWEA)
Duration: 19/11/2002 to 18/11/2003
Scope of works:
a)Survey and prepare the existing and proposed pipeline installation shop drawings.
b)Supply and installation 800 mm ~ House connections DI water line pipes, fittings, valves & fire hydrants.
c)Restore the grounds to their current conditions.
d)Coordinate the work with the Road Contractor assigned for the construction of the new roads.
Back to Past Projects
© Copyright 2007
site by ayam creative
INFRASTRUCTURE
ELECTRICAL AND INSTRUMENTATION
MECHANICAL
SUBMARINE
IRRIGATION AND LANDSCAPING
CIVIL CONSTRUCTION
FABRICATION WORKSHOP
PAST
PRESENT