Construction of Umm Al Nar (B) Water Scheme Contract No. N-00-0231
An extension to the newly installed pipeline network at a major water pumping station in Abu Dhabi that serves the capital and the water network.
Client: Abu Dhabi Water & Electricity Department
Contract Period: Completed on 2001
Scope of Works:
a)Supply and install D.I. pipes and fittings of 1,200 mm, 1,000 mm and 900 mm Dia. Pipeline for connections of water main lines with the new water pumping station in Umm Al Nar.
b)Supply and install by Directional Drilling under the seabed of approx. length 400 meters, 1,000 mm C.S. carrier pipes.
c)Supply and install all valves (1,200 mm, 1,000 mm and 900 mm) complete with valve chambers and accessories.
Testing and commissioning of the networks.