|
|
|
|
|
A 24 Room school in Liwa complete with sports facilities and laboratories with indoor and outdoor playgrounds for the students.
|
|
Client: Public Works Department
|
Contract Duration: 18 months, completed in 1993
|
|
Scope of Works:
|
|
The Project consisted of the following structures:
|
a) | Supply and construction of 24 class room secondary school for boys. |
|
b) |
Reinforced concrete structure with block wall partitions plastered and painted. |
|
c) |
Laboratory area, indoor gym, outdoor space frame covered playground area of approx. 900m2. |
|
d) |
Paved and landscaped playgrounds.
|
|
e) |
Perimeter boundary wall.
|
|
Back to Past Projects |
|
|
|
|
|
|
|
|
|